RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2006021909 - Archived data from Tue, 11. August 2020 17:40:53 CEST


This is all the information about APD 2006021909. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2006021909
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.2 V
Dark current: 17.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 235
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.6162254 V     T = -25 °C: 343.2226458 V
Voltage for Gain 150: T = +20 °C: 385.3071638 V     T = -25 °C: 350.4040352 V
Voltage for Gain 200: T = +20 °C: 389.6084647 V     T = -25 °C: 354.4352488 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.504260031 V-1     T = -25 °C: 4.956311477 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.752650834 V-1     T = -25 °C: 9.270671052 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.23818252 V-1     T = -25 °C: 16.68980763 V-1
Break-through voltage: T = +20 °C: 405.4048872 V     T = -25 °C: 369.6083936 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:34 CET jreher Updated box and position via API.
11. Aug 2020 17:40:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:08 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:25 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:36 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:46 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:53 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:58 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:38 CET jreher Updated APD location via API.
25. Nov 2019 17:29:07 CET jreher Updated box and position via API.
22. Oct 2019 12:49:09 CEST spankonin Updated APD location via API.
18. Oct 2019 13:56:19 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:52:48 CEST Tobias Imported from Hamamatsu datasheet.