RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2006021895 - Archived data from Wed, 28. April 2021 13:28:41 CEST


This is all the information about APD 2006021895. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2006021895
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.4 V
Dark current: 9.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 259
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.2564625 V     T = -25 °C: 342.8781949 V
Voltage for Gain 150: T = +20 °C: 384.9191528 V     T = -25 °C: 350.0558485 V
Voltage for Gain 200: T = +20 °C: 389.214454 V     T = -25 °C: 354.0754289 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.649065823 V-1     T = -25 °C: 5.132343443 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.22000219 V-1     T = -25 °C: 9.657943954 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31823679 V-1     T = -25 °C: 15.50216969 V-1
Break-through voltage: T = +20 °C: 404.5756633 V     T = -25 °C: 369.0319349 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:28:44 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:28:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:42 CET jreher Updated box and position via API.
11. Aug 2020 17:43:28 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:09 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:24 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:35 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:45 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:52 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:56 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:14:38 CET jreher Updated APD location via API.
25. Nov 2019 17:30:29 CET jreher Updated box and position via API.
22. Oct 2019 16:38:05 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:18:37 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:48 CEST Tobias Imported from Hamamatsu datasheet.