Show Hamamatsu Avalanche Photo Diode 2006021874 - Archived data from Fri, 05. February 2021 11:19:35 CET
This is all the information about APD 2006021874. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2006021874 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | G04 |
Break-through voltage: | 406 V |
Voltage for Gain 100 (T=+25°C): | 378.2 V |
Dark current: | 18.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 200 |
Position in Box: | 35 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 377.7404218 V T = -25 °C: 343.3427736 V |
Voltage for Gain 150: | T = +20 °C: 385.4684975 V T = -25 °C: 350.5975602 V |
Voltage for Gain 200: | T = +20 °C: 389.7886071 V T = -25 °C: 354.6569404 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.803853698 V-1 T = -25 °C: 4.889544121 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.687010625 V-1 T = -25 °C: 10.11978868 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.03889606 V-1 T = -25 °C: 16.26222383 V-1 |
Break-through voltage: | T = +20 °C: 404.9994838 V T = -25 °C: 369.4528028 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
21. Apr 2021 14:48:53 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:19:35 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:43:29 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:31:23 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:06:23 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:33 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:43 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:51 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:53 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:11:57 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:29:35 CET | jreher | Updated box and position via API. |
22. Oct 2019 16:38:05 CEST | spankonin | Updated APD batch assignment via API. |
22. Oct 2019 16:20:38 CEST | spankonin | Updated APD location via API. |
23. Jun 2016 11:52:47 CEST | Tobias | Imported from Hamamatsu datasheet. |