RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2006021862


This is all the information about APD 2006021862. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2006021862
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2006021862/3407036926
Unit: #2098 (barcode 1309021604)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 13.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 259
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: 10234
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2525832 V     T = -25 °C: 344.7039627 V
Voltage for Gain 150: T = +20 °C: 387.0387701 V     T = -25 °C: 351.9552206 V
Voltage for Gain 200: T = +20 °C: 391.4071351 V     T = -25 °C: 356.0346443 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.566621456 V-1     T = -25 °C: 5.099778772 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.910521067 V-1     T = -25 °C: 9.61456814 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.46839914 V-1     T = -25 °C: 15.27919326 V-1
Break-through voltage: T = +20 °C: 406.3276572 V     T = -25 °C: 370.5505436 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
29. Apr 2021 17:05:45 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:36 CET jreher Updated box and position via API.
05. Feb 2021 11:21:41 CET jreher Updated box and position via API.
11. Aug 2020 17:43:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:08 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:22 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:32 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:42 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:50 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:52 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:14:37 CET jreher Updated APD location via API.
25. Nov 2019 17:30:28 CET jreher Updated box and position via API.
22. Oct 2019 16:38:04 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:18:36 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:47 CEST Tobias Imported from Hamamatsu datasheet.