RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2005021842 - Archived data from Mon, 03. May 2021 15:20:58 CEST


This is all the information about APD 2005021842. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2005021842
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 259
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9568903 V     T = -25 °C: 342.8680594 V
Voltage for Gain 150: T = +20 °C: 385.8939514 V     T = -25 °C: 350.2514324 V
Voltage for Gain 200: T = +20 °C: 390.3149469 V     T = -25 °C: 354.4308699 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.568883449 V-1     T = -25 °C: 4.989021096 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.954005811 V-1     T = -25 °C: 9.21645431 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.84411781 V-1     T = -25 °C: 16.32618434 V-1
Break-through voltage: T = +20 °C: 404.2866888 V     T = -25 °C: 368.631033 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:36:37 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:58 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:40 CET jreher Updated box and position via API.
11. Aug 2020 17:43:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:07 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:21 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:31 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:41 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:49 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:50 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:14:36 CET jreher Updated APD location via API.
25. Nov 2019 17:30:27 CET jreher Updated box and position via API.
22. Oct 2019 16:38:03 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:18:35 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:46 CEST Tobias Imported from Hamamatsu datasheet.