Show Hamamatsu Avalanche Photo Diode 2005021797 - Archived data from Tue, 06. October 2020 16:50:46 CEST
This is all the information about APD 2005021797. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2005021797 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D08 |
Break-through voltage: | 408 V |
Voltage for Gain 100 (T=+25°C): | 378.7 V |
Dark current: | 9.1 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 244 |
Position in Box: | 39 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 379.3442083 V T = -25 °C: 343.8294813 V |
Voltage for Gain 150: | T = +20 °C: 387.2765665 V T = -25 °C: 351.2349211 V |
Voltage for Gain 200: | T = +20 °C: 391.6931857 V T = -25 °C: 355.4191484 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.439923945 V-1 T = -25 °C: 4.983894365 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.598677753 V-1 T = -25 °C: 9.192600882 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.86876623 V-1 T = -25 °C: 16.25502466 V-1 |
Break-through voltage: | T = +20 °C: 407.5840697 V T = -25 °C: 371.0106094 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:19:43 CET | jreher | Updated box and position via API. |
29. Jan 2021 10:25:24 CET | jreher | Assigned to capsule by script |
06. Oct 2020 16:50:46 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:42:57 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:31:31 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:06:19 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:29 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:39 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:47 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:46 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:12:08 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:29:40 CET | jreher | Updated box and position via API. |
22. Oct 2019 16:35:51 CEST | spankonin | Updated APD batch assignment via API. |
22. Oct 2019 16:16:12 CEST | spankonin | Updated APD location via API. |
23. Jun 2016 11:52:45 CEST | Tobias | Imported from Hamamatsu datasheet. |