RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2005021792 - Archived data from Mon, 03. May 2021 15:18:56 CEST


This is all the information about APD 2005021792. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2005021792
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.5 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 244
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.982425 V     T = -25 °C: 348.5918179 V
Voltage for Gain 150: T = +20 °C: 391.8549693 V     T = -25 °C: 356.064711 V
Voltage for Gain 200: T = +20 °C: 396.225095 V     T = -25 °C: 360.2790776 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.614382981 V-1     T = -25 °C: 4.669059295 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.211000138 V-1     T = -25 °C: 9.389049641 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39495727 V-1     T = -25 °C: 14.73203584 V-1
Break-through voltage: T = +20 °C: 411.376382 V     T = -25 °C: 375.4385048 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:38:09 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:18:56 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:19:43 CET jreher Updated box and position via API.
11. Aug 2020 17:42:56 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:30 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:18 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:29 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:39 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:46 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:46 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:12:08 CET jreher Updated APD location via API.
25. Nov 2019 17:29:40 CET jreher Updated box and position via API.
22. Oct 2019 16:35:51 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:16:11 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:45 CEST Tobias Imported from Hamamatsu datasheet.