RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2004021762 - Archived data from Fri, 05. February 2021 11:19:41 CET


This is all the information about APD 2004021762. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2004021762
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 11.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 244
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0086469 V     T = -25 °C: 345.5845753 V
Voltage for Gain 150: T = +20 °C: 388.928797 V     T = -25 °C: 353.022261 V
Voltage for Gain 200: T = +20 °C: 393.3375328 V     T = -25 °C: 357.2080549 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.577766606 V-1     T = -25 °C: 4.699250389 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.001010467 V-1     T = -25 °C: 9.378673397 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.90229412 V-1     T = -25 °C: 14.78367316 V-1
Break-through voltage: T = +20 °C: 408.9520097 V     T = -25 °C: 372.7321974 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:39:52 CEST oafedulidis Assigned to capsule by script
30. Aug 2021 14:07:58 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:19:41 CET jreher Updated box and position via API.
11. Aug 2020 17:42:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:29 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:17 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:27 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:38 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:45 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:45 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:12:07 CET jreher Updated APD location via API.
25. Nov 2019 17:29:38 CET jreher Updated box and position via API.
22. Oct 2019 16:35:06 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:16:10 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:44 CEST Tobias Imported from Hamamatsu datasheet.