Show Hamamatsu Avalanche Photo Diode 2004021750 - Archived data from Wed, 07. October 2020 12:16:31 CEST
This is all the information about APD 2004021750. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2004021750 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | assigned to 2319025762/2004021750 |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | red |
Manufacturer information: | |
Wafer position: | C03 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 382.3 V |
Dark current: | 14.2 nA |
Screening Logistics: | |
Available: | No |
Storage Box: | 244 |
Position in Box: | 13 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 382.5741992 V T = -25 °C: 346.8285015 V |
Voltage for Gain 150: | T = +20 °C: 390.4800822 V T = -25 °C: 354.308882 V |
Voltage for Gain 200: | T = +20 °C: 394.8588688 V T = -25 °C: 358.5210471 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.414409688 V-1 T = -25 °C: 4.909273465 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.480921278 V-1 T = -25 °C: 9.047016993 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.68396866 V-1 T = -25 °C: 15.93837265 V-1 |
Break-through voltage: | T = +20 °C: 409.8199278 V T = -25 °C: 373.7025253 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:19:40 CET | jreher | Updated box and position via API. |
07. Oct 2020 12:16:31 CEST | jreher | Assigned to capsule by script |
17. Aug 2020 15:50:14 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:42:52 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:31:28 CEST | jreher | Updated box and position via API. |
20. Feb 2020 13:32:25 CET | jreher | Updated box and position via API. |
16. Jan 2020 12:06:17 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:27 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:37 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:45 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:44 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:12:06 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:29:38 CET | jreher | Updated box and position via API. |
22. Oct 2019 16:35:06 CEST | spankonin | Updated APD batch assignment via API. |
22. Oct 2019 16:16:10 CEST | spankonin | Updated APD location via API. |
23. Jun 2016 11:52:44 CEST | Tobias | Imported from Hamamatsu datasheet. |