Show Hamamatsu Avalanche Photo Diode 2003021697 - Archived data from Fri, 05. February 2021 11:20:47 CET
This is all the information about APD 2003021697. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2003021697 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C07 |
Break-through voltage: | 408 V |
Voltage for Gain 100 (T=+25°C): | 379 V |
Dark current: | 23.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 252 |
Position in Box: | 29 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 379.6599999 V T = -25 °C: 344.1158678 V |
Voltage for Gain 150: | T = +20 °C: 387.5796664 V T = -25 °C: 351.5410293 V |
Voltage for Gain 200: | T = +20 °C: 391.9851731 V T = -25 °C: 355.7102453 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.667325892 V-1 T = -25 °C: 4.851979084 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.201036937 V-1 T = -25 °C: 9.823354372 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.29797624 V-1 T = -25 °C: 15.48693039 V-1 |
Break-through voltage: | T = +20 °C: 407.5537578 V T = -25 °C: 370.9760356 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
21. Apr 2021 14:52:56 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:20:47 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:42:49 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:32:55 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:06:15 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:25 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:36 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:43 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:42 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:13:28 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:30:05 CET | jreher | Updated box and position via API. |
22. Oct 2019 16:35:04 CEST | spankonin | Updated APD batch assignment via API. |
22. Oct 2019 16:15:27 CEST | spankonin | Updated APD location via API. |
23. Jun 2016 11:52:43 CEST | Tobias | Imported from Hamamatsu datasheet. |