RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2003021695 - Archived data from Fri, 05. February 2021 11:20:46 CET


This is all the information about APD 2003021695. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2003021695
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 377.9 V
Dark current: 15.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 252
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.8276158 V     T = -25 °C: 342.5897858 V
Voltage for Gain 150: T = +20 °C: 385.7718892 V     T = -25 °C: 349.9564031 V
Voltage for Gain 200: T = +20 °C: 390.2119574 V     T = -25 °C: 354.1177258 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.624792487 V-1     T = -25 °C: 4.720130435 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.029970165 V-1     T = -25 °C: 9.48891785 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88961747 V-1     T = -25 °C: 14.87867194 V-1
Break-through voltage: T = +20 °C: 406.3225349 V     T = -25 °C: 369.8241423 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:52:56 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:20:46 CET jreher Updated box and position via API.
11. Aug 2020 17:42:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:55 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:15 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:25 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:35 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:43 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:42 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:13:28 CET jreher Updated APD location via API.
25. Nov 2019 17:30:04 CET jreher Updated box and position via API.
22. Oct 2019 16:35:04 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:15:26 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:43 CEST Tobias Imported from Hamamatsu datasheet.