RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2003021674 - Archived data from Fri, 05. February 2021 11:20:44 CET


This is all the information about APD 2003021674. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2003021674
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.5 V
Dark current: 12.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 252
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.976967 V     T = -25 °C: 348.049085 V
Voltage for Gain 150: T = +20 °C: 391.8390742 V     T = -25 °C: 355.5634025 V
Voltage for Gain 200: T = +20 °C: 396.2042916 V     T = -25 °C: 359.7724269 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.581319111 V-1     T = -25 °C: 4.820351135 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.055678482 V-1     T = -25 °C: 9.69684029 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08539927 V-1     T = -25 °C: 15.33062134 V-1
Break-through voltage: T = +20 °C: 411.3367608 V     T = -25 °C: 375.0181442 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:21:12 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:36 CEST oafedulidis Updated box and position via API.
21. Apr 2021 14:52:54 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:20:44 CET jreher Updated box and position via API.
11. Aug 2020 17:42:44 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:53 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:13 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:23 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:34 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:41 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:40 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:13:27 CET jreher Updated APD location via API.
25. Nov 2019 17:30:03 CET jreher Updated box and position via API.
22. Oct 2019 16:34:29 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:15:25 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:42 CEST Tobias Imported from Hamamatsu datasheet.