Show Hamamatsu Avalanche Photo Diode 2003021658 - Archived data from Tue, 11. August 2020 17:43:09 CEST
This is all the information about APD 2003021658. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2003021658 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C12 |
Break-through voltage: | 416 V |
Voltage for Gain 100 (T=+25°C): | 387.6 V |
Dark current: | 4.4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 236 |
Position in Box: | 47 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 388.0549101 V T = -25 °C: 351.912962 V |
Voltage for Gain 150: | T = +20 °C: 395.9280091 V T = -25 °C: 359.5335591 V |
Voltage for Gain 200: | T = +20 °C: 400.3030273 V T = -25 °C: 363.8012707 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.562676927 V-1 T = -25 °C: 4.825573707 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.059559005 V-1 T = -25 °C: 8.724753636 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.02259398 V-1 T = -25 °C: 15.1661892 V-1 |
Break-through voltage: | T = +20 °C: 415.8790014 V T = -25 °C: 379.7283784 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:18:46 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:43:09 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:30:22 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:06:12 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:23 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:33 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:40 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:40 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:10:52 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:29:15 CET | jreher | Updated box and position via API. |
22. Oct 2019 16:36:57 CEST | spankonin | Updated APD batch assignment via API. |
22. Oct 2019 16:17:11 CEST | spankonin | Updated APD location via API. |
23. Jun 2016 11:52:41 CEST | Tobias | Imported from Hamamatsu datasheet. |