RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2002021606 - Archived data from Tue, 11. August 2020 17:43:05 CEST


This is all the information about APD 2002021606. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2002021606
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H05
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 11.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 236
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7593934 V     T = -25 °C: 344.6872425 V
Voltage for Gain 150: T = +20 °C: 387.7630855 V     T = -25 °C: 352.113767 V
Voltage for Gain 200: T = +20 °C: 392.221854 V     T = -25 °C: 356.3137217 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.612822865 V-1     T = -25 °C: 4.671717389 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.037877735 V-1     T = -25 °C: 9.331437289 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.90335569 V-1     T = -25 °C: 14.55208262 V-1
Break-through voltage: T = +20 °C: 404.9901731 V     T = -25 °C: 369.4834508 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:44 CET jreher Updated box and position via API.
11. Aug 2020 17:43:05 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:21 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:10 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:21 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:31 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:39 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:38 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:51 CET jreher Updated APD location via API.
25. Nov 2019 17:29:14 CET jreher Updated box and position via API.
22. Oct 2019 16:36:28 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:17:10 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:40 CEST Tobias Imported from Hamamatsu datasheet.