RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2002021580 - Archived data from Wed, 07. October 2020 15:44:18 CEST


This is all the information about APD 2002021580. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2002021580
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 14.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 248
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1484275 V     T = -25 °C: 346.5152987 V
Voltage for Gain 150: T = +20 °C: 389.0470628 V     T = -25 °C: 353.9945079 V
Voltage for Gain 200: T = +20 °C: 393.4525768 V     T = -25 °C: 358.2700352 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.490558861 V-1     T = -25 °C: 4.562376106 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.786920644 V-1     T = -25 °C: 9.380718438 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.2011809 V-1     T = -25 °C: 15.51356903 V-1
Break-through voltage: T = +20 °C: 407.9929863 V     T = -25 °C: 371.7197955 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:15 CET jreher Updated box and position via API.
07. Oct 2020 15:44:18 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:33 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:11 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:53 CET jreher Updated APD location via API.
25. Nov 2019 17:29:55 CET jreher Updated box and position via API.
21. Nov 2019 16:54:04 CET spankonin Updated APD location via API.
21. Nov 2019 16:41:37 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:43 CEST Tobias Imported from Hamamatsu datasheet.