RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2002021578 - Archived data from Wed, 07. October 2020 14:22:35 CEST


This is all the information about APD 2002021578. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2002021578
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0902009100/2002021578
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 16.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 248
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.595472 V     T = -25 °C: 344.975452 V
Voltage for Gain 150: T = +20 °C: 388.4716543 V     T = -25 °C: 352.336023 V
Voltage for Gain 200: T = +20 °C: 392.8292888 V     T = -25 °C: 356.4737176 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.387624072 V-1     T = -25 °C: 4.913266013 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.479805702 V-1     T = -25 °C: 9.131947485 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.68170118 V-1     T = -25 °C: 16.23080621 V-1
Break-through voltage: T = +20 °C: 408.0819314 V     T = -25 °C: 371.4243715 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:15 CET jreher Updated box and position via API.
07. Oct 2020 14:22:35 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:51 CEST jreher Updated box and position via API.
11. Aug 2020 17:48:32 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:11 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:53 CET jreher Updated APD location via API.
25. Nov 2019 17:29:54 CET jreher Updated box and position via API.
21. Nov 2019 16:54:04 CET spankonin Updated APD location via API.
21. Nov 2019 16:41:37 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:43 CEST Tobias Imported from Hamamatsu datasheet.