RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2002021566 - Archived data from Wed, 07. October 2020 15:44:18 CEST


This is all the information about APD 2002021566. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2002021566
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.5 V
Dark current: 11.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 248
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1166595 V     T = -25 °C: 343.1904563 V
Voltage for Gain 150: T = +20 °C: 386.0457087 V     T = -25 °C: 350.5128929 V
Voltage for Gain 200: T = +20 °C: 390.4710463 V     T = -25 °C: 354.6155315 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.516335656 V-1     T = -25 °C: 4.889682795 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.793557612 V-1     T = -25 °C: 9.060257274 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21837107 V-1     T = -25 °C: 16.04173657 V-1
Break-through voltage: T = +20 °C: 405.8614015 V     T = -25 °C: 369.5872512 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:13 CET jreher Updated box and position via API.
07. Oct 2020 15:44:18 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:30 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:10 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:52 CET jreher Updated APD location via API.
25. Nov 2019 17:29:54 CET jreher Updated box and position via API.
21. Nov 2019 16:54:03 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:08 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:42 CEST Tobias Imported from Hamamatsu datasheet.