RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2002021561 - Archived data from Tue, 11. August 2020 17:46:54 CEST


This is all the information about APD 2002021561. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2002021561
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2002021561/2520029104
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 13.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 206
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.7192552 V     T = -25 °C: 342.5116268 V
Voltage for Gain 150: T = +20 °C: 385.5970173 V     T = -25 °C: 349.829889 V
Voltage for Gain 200: T = +20 °C: 389.9823877 V     T = -25 °C: 353.9420924 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.677786609 V-1     T = -25 °C: 4.761186496 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.236406456 V-1     T = -25 °C: 9.662797662 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36150489 V-1     T = -25 °C: 15.34235442 V-1
Break-through voltage: T = +20 °C: 405.7562041 V     T = -25 °C: 369.2631603 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:51 CET jreher Updated box and position via API.
11. Aug 2020 17:46:54 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:55 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:50 CET jreher Updated box and position via API.
27. Nov 2019 20:05:31 CET jreher Updated APD location via API.
25. Nov 2019 17:27:03 CET jreher Updated box and position via API.
25. Nov 2019 14:20:17 CET spankonin Updated APD batch assignment via API.
18. Nov 2019 18:19:22 CET spankonin Updated APD location via API.
18. Nov 2019 18:17:54 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:42 CEST Tobias Imported from Hamamatsu datasheet.