RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2001021554 - Archived data from Tue, 08. December 2020 17:07:08 CET


This is all the information about APD 2001021554. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2001021554
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2001021554/2402026007
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 206
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.4778612 V     T = -25 °C: 350.4381837 V
Voltage for Gain 150: T = +20 °C: 394.2981639 V     T = -25 °C: 357.9417418 V
Voltage for Gain 200: T = +20 °C: 398.6270736 V     T = -25 °C: 362.1444834 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.4554231 V-1     T = -25 °C: 4.683140439 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.703624848 V-1     T = -25 °C: 9.358369863 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.23709628 V-1     T = -25 °C: 14.66704693 V-1
Break-through voltage: T = +20 °C: 413.137396 V     T = -25 °C: 377.1311493 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:50 CET jreher Updated box and position via API.
08. Dec 2020 17:07:08 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:01 CEST vwerner Updated box and position via API.
11. Aug 2020 17:46:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:30 CET jreher Updated APD location via API.
25. Nov 2019 17:27:02 CET jreher Updated box and position via API.
25. Nov 2019 14:20:16 CET spankonin Updated APD batch assignment via API.
18. Nov 2019 18:19:22 CET spankonin Updated APD location via API.
18. Nov 2019 18:17:54 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:42 CEST Tobias Imported from Hamamatsu datasheet.