RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2001021547 - Archived data from Fri, 05. February 2021 11:14:49 CET


This is all the information about APD 2001021547. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2001021547
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.5 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 206
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7590333 V     T = -25 °C: 351.6732323 V
Voltage for Gain 150: T = +20 °C: 395.5407158 V     T = -25 °C: 359.194653 V
Voltage for Gain 200: T = +20 °C: 399.8358107 V     T = -25 °C: 363.4227722 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.701169999 V-1     T = -25 °C: 4.580457974 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.493507623 V-1     T = -25 °C: 9.104784217 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.95309188 V-1     T = -25 °C: 16.047725 V-1
Break-through voltage: T = +20 °C: 415.1540308 V     T = -25 °C: 379.0143558 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:09 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:20 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:14:49 CET jreher Updated box and position via API.
11. Aug 2020 17:46:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:29 CET jreher Updated APD location via API.
25. Nov 2019 17:27:01 CET jreher Updated box and position via API.
25. Nov 2019 14:20:16 CET spankonin Updated APD batch assignment via API.
18. Nov 2019 18:19:21 CET spankonin Updated APD location via API.
18. Nov 2019 18:17:53 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:42 CEST Tobias Imported from Hamamatsu datasheet.