RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2001021537 - Archived data from Mon, 17. August 2020 15:53:05 CEST


This is all the information about APD 2001021537. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2001021537
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.3 V
Dark current: 15.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 206
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.3888892 V     T = -25 °C: 341.2235777 V
Voltage for Gain 150: T = +20 °C: 384.2476928 V     T = -25 °C: 348.5500993 V
Voltage for Gain 200: T = +20 °C: 388.6117065 V     T = -25 °C: 352.6377585 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.472806257 V-1     T = -25 °C: 4.908288966 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.680605102 V-1     T = -25 °C: 9.942578276 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15473022 V-1     T = -25 °C: 16.059861 V-1
Break-through voltage: T = +20 °C: 403.3755537 V     T = -25 °C: 367.2174574 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:53 CET jreher Updated box and position via API.
07. Oct 2020 12:16:09 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:05 CEST jreher Updated box and position via API.
11. Aug 2020 17:46:57 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:32 CET jreher Updated APD location via API.
25. Nov 2019 17:27:04 CET jreher Updated box and position via API.
18. Nov 2019 18:19:24 CET spankonin Updated APD location via API.
18. Nov 2019 18:17:18 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:42 CEST Tobias Imported from Hamamatsu datasheet.