RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2001021529 - Archived data from Tue, 06. October 2020 16:52:12 CEST


This is all the information about APD 2001021529. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2001021529
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 17.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 206
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.4048907 V     T = -25 °C: 347.464906 V
Voltage for Gain 150: T = +20 °C: 391.2757244 V     T = -25 °C: 354.9419706 V
Voltage for Gain 200: T = +20 °C: 395.6435519 V     T = -25 °C: 359.1618826 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.471065497 V-1     T = -25 °C: 4.645175173 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.721586382 V-1     T = -25 °C: 9.507819248 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18364593 V-1     T = -25 °C: 14.80411898 V-1
Break-through voltage: T = +20 °C: 409.5102404 V     T = -25 °C: 373.7920088 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:52 CET jreher Updated box and position via API.
29. Jan 2021 10:24:43 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:12 CEST jreher Updated box and position via API.
11. Aug 2020 17:46:56 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:31 CET jreher Updated APD location via API.
25. Nov 2019 17:27:03 CET jreher Updated box and position via API.
18. Nov 2019 18:19:23 CET spankonin Updated APD location via API.
18. Nov 2019 18:17:17 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:41 CEST Tobias Imported from Hamamatsu datasheet.