RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2001021513 - Archived data from Tue, 11. August 2020 17:48:46 CEST


This is all the information about APD 2001021513. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2001021513
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7836546 V     T = -25 °C: 345.1844732 V
Voltage for Gain 150: T = +20 °C: 388.5906177 V     T = -25 °C: 352.5748865 V
Voltage for Gain 200: T = +20 °C: 392.9103584 V     T = -25 °C: 356.709619 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.71851643 V-1     T = -25 °C: 4.871868391 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.438907227 V-1     T = -25 °C: 9.916851542 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.78745321 V-1     T = -25 °C: 15.80985083 V-1
Break-through voltage: T = +20 °C: 407.3326171 V     T = -25 °C: 371.3217907 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:50 CET jreher Updated box and position via API.
07. Oct 2020 15:44:20 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:46 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:02 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:36 CET jreher Updated APD location via API.
25. Nov 2019 17:30:06 CET jreher Updated box and position via API.
21. Nov 2019 16:55:42 CET spankonin Updated APD location via API.
21. Nov 2019 16:37:00 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:41 CEST Tobias Imported from Hamamatsu datasheet.