RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1915021481 - Archived data from Tue, 06. October 2020 16:53:10 CEST


This is all the information about APD 1915021481. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1915021481
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 23.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 263
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3273758 V     T = -25 °C: 348.4362563 V
Voltage for Gain 150: T = +20 °C: 392.1354804 V     T = -25 °C: 355.9050401 V
Voltage for Gain 200: T = +20 °C: 396.4762115 V     T = -25 °C: 360.1082872 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.515705638 V-1     T = -25 °C: 4.719956821 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.900369324 V-1     T = -25 °C: 9.404097991 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.51269422 V-1     T = -25 °C: 14.70059799 V-1
Break-through voltage: T = +20 °C: 411.5966733 V     T = -25 °C: 375.5015787 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:14 CET jreher Updated box and position via API.
08. Dec 2020 17:17:59 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:10 CEST jreher Updated box and position via API.
11. Aug 2020 17:49:38 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:55 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:13 CET jreher Updated APD location via API.
25. Nov 2019 17:30:39 CET jreher Updated box and position via API.
25. Nov 2019 17:17:52 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:51:40 CEST Tobias Imported from Hamamatsu datasheet.