Show Hamamatsu Avalanche Photo Diode 1915021481 - Archived data from Tue, 06. October 2020 16:53:10 CEST
This is all the information about APD 1915021481. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 1915021481 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | G11 |
Break-through voltage: | 412 V |
Voltage for Gain 100 (T=+25°C): | 383.8 V |
Dark current: | 23.4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 263 |
Position in Box: | 45 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 384.3273758 V T = -25 °C: 348.4362563 V |
Voltage for Gain 150: | T = +20 °C: 392.1354804 V T = -25 °C: 355.9050401 V |
Voltage for Gain 200: | T = +20 °C: 396.4762115 V T = -25 °C: 360.1082872 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.515705638 V-1 T = -25 °C: 4.719956821 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.900369324 V-1 T = -25 °C: 9.404097991 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.51269422 V-1 T = -25 °C: 14.70059799 V-1 |
Break-through voltage: | T = +20 °C: 411.5966733 V T = -25 °C: 375.5015787 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:22:14 CET | jreher | Updated box and position via API. |
08. Dec 2020 17:17:59 CET | jreher | Assigned to capsule by script |
06. Oct 2020 16:53:10 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:49:38 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:34:55 CEST | jreher | Updated box and position via API. |
27. Nov 2019 20:15:13 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:30:39 CET | jreher | Updated box and position via API. |
25. Nov 2019 17:17:52 CET | spankonin | Updated APD batch assignment via API. |
23. Jun 2016 11:51:40 CEST | Tobias | Imported from Hamamatsu datasheet. |