RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1915021472 - Archived data from Fri, 05. February 2021 11:22:13 CET


This is all the information about APD 1915021472. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1915021472
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 263
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.348796 V     T = -25 °C: 351.3293664 V
Voltage for Gain 150: T = +20 °C: 395.1173536 V     T = -25 °C: 358.8264333 V
Voltage for Gain 200: T = +20 °C: 399.434115 V     T = -25 °C: 363.0319071 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.506250356 V-1     T = -25 °C: 4.735861928 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.912774321 V-1     T = -25 °C: 9.434564536 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.6856889 V-1     T = -25 °C: 14.86895318 V-1
Break-through voltage: T = +20 °C: 414.5721026 V     T = -25 °C: 378.4685187 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:08 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:22:13 CET jreher Updated box and position via API.
11. Aug 2020 17:49:35 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:54 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:12 CET jreher Updated APD location via API.
25. Nov 2019 17:30:38 CET jreher Updated box and position via API.
25. Nov 2019 17:17:51 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:03 CEST Tobias Imported from Hamamatsu datasheet.