RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1915021471 - Archived data from Fri, 18. December 2020 14:00:37 CET


This is all the information about APD 1915021471. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1915021471
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 14.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 263
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8714475 V     T = -25 °C: 348.1405435 V
Voltage for Gain 150: T = +20 °C: 391.7069256 V     T = -25 °C: 355.5931586 V
Voltage for Gain 200: T = +20 °C: 396.047482 V     T = -25 °C: 359.7556232 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.658068233 V-1     T = -25 °C: 4.846588702 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.278923674 V-1     T = -25 °C: 9.878295851 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.57284802 V-1     T = -25 °C: 15.65256067 V-1
Break-through voltage: T = +20 °C: 411.4770287 V     T = -25 °C: 375.0609466 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:43:16 CET jreher Assigned to capsule by script
05. Feb 2021 11:22:13 CET jreher Updated box and position via API.
18. Dec 2020 14:00:37 CET jreher Updated box and position via API.
11. Aug 2020 17:49:35 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:54 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:12 CET jreher Updated APD location via API.
25. Nov 2019 17:30:38 CET jreher Updated box and position via API.
25. Nov 2019 17:17:51 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:03 CEST Tobias Imported from Hamamatsu datasheet.