RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1915021468 - Archived data from Tue, 16. February 2021 12:26:08 CET


This is all the information about APD 1915021468. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1915021468
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 18.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 263
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1280143 V     T = -25 °C: 347.4106092 V
Voltage for Gain 150: T = +20 °C: 390.9346016 V     T = -25 °C: 354.8420645 V
Voltage for Gain 200: T = +20 °C: 395.2801899 V     T = -25 °C: 359.0171625 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.571640822 V-1     T = -25 °C: 4.739040723 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.03199676 V-1     T = -25 °C: 9.503512299 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.04187113 V-1     T = -25 °C: 14.89748005 V-1
Break-through voltage: T = +20 °C: 410.456839 V     T = -25 °C: 374.2098859 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:04:35 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:08 CET jreher Updated box and position via API.
05. Feb 2021 11:22:13 CET jreher Updated box and position via API.
11. Aug 2020 17:49:35 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:54 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:12 CET jreher Updated APD location via API.
25. Nov 2019 17:30:38 CET jreher Updated box and position via API.
25. Nov 2019 17:17:51 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:03 CEST Tobias Imported from Hamamatsu datasheet.