RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1915021449 - Archived data from Tue, 11. August 2020 17:49:31 CEST


This is all the information about APD 1915021449. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1915021449
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 400 V
Voltage for Gain 100 (T=+25°C): 372 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 263
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.31666 V     T = -25 °C: 338.6669601 V
Voltage for Gain 150: T = +20 °C: 381.1228109 V     T = -25 °C: 345.850171 V
Voltage for Gain 200: T = +20 °C: 385.4979163 V     T = -25 °C: 349.9025503 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.529780828 V-1     T = -25 °C: 5.171376485 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.789002824 V-1     T = -25 °C: 9.799644552 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30014537 V-1     T = -25 °C: 15.63498781 V-1
Break-through voltage: T = +20 °C: 399.284944 V     T = -25 °C: 363.4902069 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:05 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:22:11 CET jreher Updated box and position via API.
11. Aug 2020 17:49:31 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:34:52 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:10 CET jreher Updated APD location via API.
25. Nov 2019 17:30:36 CET jreher Updated box and position via API.
25. Nov 2019 17:18:21 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:03 CEST Tobias Imported from Hamamatsu datasheet.