RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1915021433 - Archived data from Tue, 11. August 2020 17:49:50 CEST


This is all the information about APD 1915021433. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1915021433
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1915021433/2705030340
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.6 V
Dark current: 14.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 271
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.4199227 V     T = -25 °C: 342.3073017 V
Voltage for Gain 150: T = +20 °C: 385.2605446 V     T = -25 °C: 349.6111622 V
Voltage for Gain 200: T = +20 °C: 389.6254188 V     T = -25 °C: 353.7143779 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.478299982 V-1     T = -25 °C: 4.860425728 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.732579884 V-1     T = -25 °C: 9.931250804 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.10745223 V-1     T = -25 °C: 15.80951099 V-1
Break-through voltage: T = +20 °C: 404.8320165 V     T = -25 °C: 368.7487318 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:23:13 CET jreher Updated box and position via API.
11. Aug 2020 17:49:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:36:22 CEST jreher Updated box and position via API.
03. Apr 2020 09:46:34 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:01 CET jreher Updated box and position via API.
27. Nov 2019 20:16:16 CET jreher Updated APD location via API.
25. Nov 2019 17:30:51 CET jreher Updated box and position via API.
25. Nov 2019 17:15:50 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:02 CEST Tobias Imported from Hamamatsu datasheet.