RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1915021418 - Archived data from Tue, 11. August 2020 17:48:56 CEST


This is all the information about APD 1915021418. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1915021418
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2313025259/1915021418
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.6 V
Dark current: 24.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 255
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7353154 V     T = -25 °C: 343.390064 V
Voltage for Gain 150: T = +20 °C: 386.5740298 V     T = -25 °C: 350.7197901 V
Voltage for Gain 200: T = +20 °C: 390.9165215 V     T = -25 °C: 354.8304129 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.713057602 V-1     T = -25 °C: 4.840820657 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.391954742 V-1     T = -25 °C: 9.812601007 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70432162 V-1     T = -25 °C: 15.66567912 V-1
Break-through voltage: T = +20 °C: 405.9061218 V     T = -25 °C: 369.577476 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:05 CET jreher Updated box and position via API.
11. Aug 2020 17:48:56 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:22 CEST jreher Updated box and position via API.
03. Apr 2020 10:01:55 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:24 CET jreher Updated box and position via API.
27. Nov 2019 20:13:59 CET jreher Updated APD location via API.
25. Nov 2019 17:30:16 CET jreher Updated box and position via API.
21. Nov 2019 16:56:17 CET spankonin Updated APD location via API.
21. Nov 2019 16:35:48 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:02 CEST Tobias Imported from Hamamatsu datasheet.