RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1915021414 - Archived data from Fri, 05. February 2021 11:15:10 CET


This is all the information about APD 1915021414. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1915021414
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 16.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 208
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.3234597 V     T = -25 °C: 346.8126612 V
Voltage for Gain 150: T = +20 °C: 390.2136707 V     T = -25 °C: 354.2298953 V
Voltage for Gain 200: T = +20 °C: 394.5934176 V     T = -25 °C: 358.4186664 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.446520173 V-1     T = -25 °C: 4.961952782 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.66219886 V-1     T = -25 °C: 9.130838435 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03792947 V-1     T = -25 °C: 16.09009206 V-1
Break-through voltage: T = +20 °C: 402.9058491 V     T = -25 °C: 373.0698038 V
   
Notes:


Version history

Time Author Change comment
07. Feb 2022 10:46:07 CET oafedulidis Assigned to capsule by script
17. May 2021 09:17:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:15:10 CET jreher Updated box and position via API.
11. Aug 2020 17:47:09 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:55 CET jreher Updated APD location via API.
25. Nov 2019 17:27:15 CET jreher Updated box and position via API.
18. Nov 2019 18:19:46 CET spankonin Updated APD location via API.
18. Nov 2019 18:16:19 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:02 CEST Tobias Imported from Hamamatsu datasheet.