Show Hamamatsu Avalanche Photo Diode 1914021385 - Archived data from Tue, 11. August 2020 17:47:03 CEST


This is all the information about APD 1914021385. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1914021385
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1914021385/2316025538
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 208
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8166427 V     T = -25 °C: 346.3558239 V
Voltage for Gain 150: T = +20 °C: 389.6273011 V     T = -25 °C: 353.7589372 V
Voltage for Gain 200: T = +20 °C: 393.9528448 V     T = -25 °C: 357.9051869 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.702476626 V-1     T = -25 °C: 4.785259805 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.398675318 V-1     T = -25 °C: 9.712218991 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67185995 V-1     T = -25 °C: 15.34171875 V-1
Break-through voltage: T = +20 °C: 409.4782058 V     T = -25 °C: 373.4520254 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:07 CET jreher Updated box and position via API.
11. Aug 2020 17:47:03 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:02 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:00 CET jreher Updated box and position via API.
27. Nov 2019 20:05:52 CET jreher Updated APD location via API.
25. Nov 2019 17:27:12 CET jreher Updated box and position via API.
18. Nov 2019 18:19:43 CET spankonin Updated APD location via API.
18. Nov 2019 18:16:47 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:01 CEST Tobias Imported from Hamamatsu datasheet.