RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1914021379 - Archived data from Tue, 11. August 2020 17:47:02 CEST


This is all the information about APD 1914021379. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1914021379
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2314025310/1914021379
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 17.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 208
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.8395982 V     T = -25 °C: 344.3796433 V
Voltage for Gain 150: T = +20 °C: 387.6937261 V     T = -25 °C: 351.7219464 V
Voltage for Gain 200: T = +20 °C: 392.0466902 V     T = -25 °C: 355.844681 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.644809394 V-1     T = -25 °C: 4.820201278 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.265493296 V-1     T = -25 °C: 9.725852236 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.4565976 V-1     T = -25 °C: 15.54351545 V-1
Break-through voltage: T = +20 °C: 407.5821291 V     T = -25 °C: 371.1158997 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:06 CET jreher Updated box and position via API.
11. Aug 2020 17:47:02 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:46 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:53 CET jreher Updated box and position via API.
27. Nov 2019 20:05:52 CET jreher Updated APD location via API.
25. Nov 2019 17:27:11 CET jreher Updated box and position via API.
18. Nov 2019 18:19:43 CET spankonin Updated APD location via API.
18. Nov 2019 18:16:46 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:01 CEST Tobias Imported from Hamamatsu datasheet.