RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1914021374 - Archived data from Tue, 11. August 2020 17:47:01 CEST


This is all the information about APD 1914021374. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1914021374
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1914021334/1914021374
Unit: #901 (barcode 1309010066)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 208
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9846107 V     T = -25 °C: 345.4067322 V
Voltage for Gain 150: T = +20 °C: 388.8125376 V     T = -25 °C: 352.7768528 V
Voltage for Gain 200: T = +20 °C: 393.1480638 V     T = -25 °C: 356.9062947 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.645162627 V-1     T = -25 °C: 4.813356292 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.244331658 V-1     T = -25 °C: 9.824204114 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59381483 V-1     T = -25 °C: 15.77506219 V-1
Break-through voltage: T = +20 °C: 408.6391725 V     T = -25 °C: 372.4282003 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:06 CET jreher Updated box and position via API.
11. Aug 2020 17:47:01 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:51:54 CEST jreher Assigned to capsule by script
13. Feb 2020 14:19:55 CET jreher Updated box and position via API.
27. Nov 2019 20:05:52 CET jreher Updated APD location via API.
25. Nov 2019 17:27:11 CET jreher Updated box and position via API.
18. Nov 2019 18:19:43 CET spankonin Updated APD location via API.
18. Nov 2019 18:16:46 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:01 CEST Tobias Imported from Hamamatsu datasheet.