RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1914021362 - Archived data from Tue, 11. August 2020 17:47:07 CEST


This is all the information about APD 1914021362. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1914021362
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2516028768/1914021362
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 21.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 208
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1130837 V     T = -25 °C: 345.3086245 V
Voltage for Gain 150: T = +20 °C: 388.9229826 V     T = -25 °C: 352.7195857 V
Voltage for Gain 200: T = +20 °C: 393.2668239 V     T = -25 °C: 356.8691986 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.565687025 V-1     T = -25 °C: 4.804502039 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.06833536 V-1     T = -25 °C: 9.735660381 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.11405791 V-1     T = -25 °C: 15.47761947 V-1
Break-through voltage: T = +20 °C: 408.7705928 V     T = -25 °C: 372.2960173 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:09 CET jreher Updated box and position via API.
11. Aug 2020 17:47:07 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:52 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:49 CET jreher Updated box and position via API.
27. Nov 2019 20:05:54 CET jreher Updated APD location via API.
25. Nov 2019 17:27:14 CET jreher Updated box and position via API.
18. Nov 2019 18:19:45 CET spankonin Updated APD location via API.
18. Nov 2019 18:16:18 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:00 CEST Tobias Imported from Hamamatsu datasheet.