RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0717006684 - Archived data from Tue, 11. August 2020 17:57:04 CEST


This is all the information about APD 0717006684. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0717006684
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.1 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 42
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 77
Position in grid: 5
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 392.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.9384829 V     T = -25 °C: 356.8758882 V
Voltage for Gain 150: T = +20 °C: 400.7995252 V     T = -25 °C: 364.3994824 V
Voltage for Gain 200: T = +20 °C: 405.1517658 V     T = -25 °C: 368.6255091 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.613908502 V-1     T = -25 °C: 4.881923014 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.191492744 V-1     T = -25 °C: 8.969552003 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39801534 V-1     T = -25 °C: 15.78955649 V-1
Break-through voltage: T = +20 °C: 420.0585764 V     T = -25 °C: 383.6892422 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:55 CET jreher Updated box and position via API.
11. Aug 2020 17:57:04 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:32 CEST jreher Updated box and position via API.
19. Dec 2019 15:51:15 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:45 CET jreher Updated box and position via API.
10. Aug 2017 15:15:46 CEST hans-georg.zaunick Entered shipped after irradiation date.
08. Aug 2017 17:56:47 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:55:45 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:49:28 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:13 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:17 CEST Tobias Imported from Hamamatsu datasheet.