RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1914021341 - Archived data from Tue, 11. August 2020 17:49:01 CEST


This is all the information about APD 1914021341. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1914021341
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 11.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 255
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3193257 V     T = -25 °C: 345.1741141 V
Voltage for Gain 150: T = +20 °C: 389.1276644 V     T = -25 °C: 352.5526083 V
Voltage for Gain 200: T = +20 °C: 393.4414535 V     T = -25 °C: 356.772282 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.769481987 V-1     T = -25 °C: 4.75371316 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.32662048 V-1     T = -25 °C: 10.20583582 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.62390028 V-1     T = -25 °C: 13.35227576 V-1
Break-through voltage: T = +20 °C: 409.0633889 V     T = -25 °C: 371.6662157 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:08 CET jreher Updated box and position via API.
11. Aug 2020 17:49:01 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:23 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:01 CET jreher Updated APD location via API.
25. Nov 2019 17:30:18 CET jreher Updated box and position via API.
25. Nov 2019 15:26:47 CET spankonin Updated APD batch assignment via API.
21. Nov 2019 16:56:19 CET spankonin Updated APD location via API.
23. Jun 2016 11:50:00 CEST Tobias Imported from Hamamatsu datasheet.