RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1914021332 - Archived data from Fri, 05. February 2021 11:21:07 CET


This is all the information about APD 1914021332. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1914021332
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B03
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 18.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 255
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.7002821 V     T = -25 °C: 343.2940937 V
Voltage for Gain 150: T = +20 °C: 386.5488963 V     T = -25 °C: 350.6278706 V
Voltage for Gain 200: T = +20 °C: 390.8883583 V     T = -25 °C: 354.7301046 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.697992937 V-1     T = -25 °C: 4.839037474 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.405409337 V-1     T = -25 °C: 9.898357122 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.71709022 V-1     T = -25 °C: 15.86380127 V-1
Break-through voltage: T = +20 °C: 401.0518885 V     T = -25 °C: 368.7020397 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:13 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:07 CET jreher Updated box and position via API.
11. Aug 2020 17:48:59 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:23 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:00 CET jreher Updated APD location via API.
25. Nov 2019 17:30:17 CET jreher Updated box and position via API.
21. Nov 2019 16:56:18 CET spankonin Updated APD location via API.
21. Nov 2019 16:35:50 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:50:00 CEST Tobias Imported from Hamamatsu datasheet.