RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0717006681 - Archived data from Tue, 11. August 2020 17:57:04 CEST


This is all the information about APD 0717006681. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0717006681
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 390 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 77
Position in grid: 18
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 390 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.4006848 V     T = -25 °C: 352.9964623 V
Voltage for Gain 150: T = +20 °C: 398.0842883 V     T = -25 °C: 360.6716151 V
Voltage for Gain 200: T = +20 °C: 402.3407773 V     T = -25 °C: 364.9866771 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.567423775 V-1     T = -25 °C: 4.726101739 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.133830707 V-1     T = -25 °C: 9.493640408 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.43762871 V-1     T = -25 °C: 14.78734178 V-1
Break-through voltage: T = +20 °C: 415.6383903 V     T = -25 °C: 379.7042598 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:23:47 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:29:50 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:54 CET jreher Updated box and position via API.
11. Aug 2020 17:57:04 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:42 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:32 CEST jreher Updated box and position via API.
19. Dec 2019 15:51:15 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:45 CET jreher Updated box and position via API.
10. Aug 2017 15:15:46 CEST hans-georg.zaunick Entered shipped after irradiation date.
08. Aug 2017 17:56:47 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:55:45 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:49:29 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:13 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:17 CEST Tobias Imported from Hamamatsu datasheet.