RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021312 - Archived data from Tue, 11. August 2020 17:49:05 CEST


This is all the information about APD 1913021312. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021312
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 255
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3296107 V     T = -25 °C: 342.634728 V
Voltage for Gain 150: T = +20 °C: 386.2266797 V     T = -25 °C: 349.9953285 V
Voltage for Gain 200: T = +20 °C: 390.5590967 V     T = -25 °C: 354.1248886 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.391626385 V-1     T = -25 °C: 4.971437545 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.94633956 V-1     T = -25 °C: 9.844417602 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.34196985 V-1     T = -25 °C: 13.32914655 V-1
Break-through voltage: T = +20 °C: 405.6832048 V     T = -25 °C: 369.3805002 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:10 CET jreher Updated box and position via API.
11. Aug 2020 17:49:05 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:25 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:02 CET jreher Updated APD location via API.
25. Nov 2019 17:30:19 CET jreher Updated box and position via API.
25. Nov 2019 15:26:48 CET spankonin Updated APD batch assignment via API.
21. Nov 2019 16:56:20 CET spankonin Updated APD location via API.
23. Jun 2016 11:49:59 CEST Tobias Imported from Hamamatsu datasheet.