RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021311 - Archived data from Tue, 11. August 2020 17:49:05 CEST


This is all the information about APD 1913021311. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021311
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 255
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2750213 V     T = -25 °C: 343.5745621 V
Voltage for Gain 150: T = +20 °C: 387.1330943 V     T = -25 °C: 350.9970669 V
Voltage for Gain 200: T = +20 °C: 391.4415065 V     T = -25 °C: 355.1510382 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.50479705 V-1     T = -25 °C: 4.881793878 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.641406447 V-1     T = -25 °C: 9.11199853 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96309405 V-1     T = -25 °C: 15.25952324 V-1
Break-through voltage: T = +20 °C: 404.6249182 V     T = -25 °C: 369.8845065 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:10 CET jreher Updated box and position via API.
11. Aug 2020 17:49:05 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:25 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:02 CET jreher Updated APD location via API.
25. Nov 2019 17:30:19 CET jreher Updated box and position via API.
25. Nov 2019 15:26:48 CET spankonin Updated APD batch assignment via API.
21. Nov 2019 16:56:20 CET spankonin Updated APD location via API.
23. Jun 2016 11:49:59 CEST Tobias Imported from Hamamatsu datasheet.