RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021297 - Archived data from Tue, 11. August 2020 17:49:02 CEST


This is all the information about APD 1913021297. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021297
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.9 V
Dark current: 10.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 255
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.950769 V     T = -25 °C: 340.6363536 V
Voltage for Gain 150: T = +20 °C: 383.7303816 V     T = -25 °C: 347.8848631 V
Voltage for Gain 200: T = +20 °C: 388.1799085 V     T = -25 °C: 351.9190313 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.621517553 V-1     T = -25 °C: 4.604478809 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.411403847 V-1     T = -25 °C: 10.09644033 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.19131621 V-1     T = -25 °C: 16.75515697 V-1
Break-through voltage: T = +20 °C: 403.0893624 V     T = -25 °C: 366.8989788 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:21:15 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:09 CET jreher Updated box and position via API.
11. Aug 2020 17:49:02 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:24 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:01 CET jreher Updated APD location via API.
25. Nov 2019 17:30:18 CET jreher Updated box and position via API.
25. Nov 2019 15:26:47 CET spankonin Updated APD batch assignment via API.
21. Nov 2019 16:56:19 CET spankonin Updated APD location via API.
23. Jun 2016 11:49:59 CEST Tobias Imported from Hamamatsu datasheet.