RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021294 - Archived data from Wed, 07. October 2020 15:44:29 CEST


This is all the information about APD 1913021294. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021294
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.2 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 265
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9064427 V     T = -25 °C: 342.6900943 V
Voltage for Gain 150: T = +20 °C: 385.7463946 V     T = -25 °C: 349.9565535 V
Voltage for Gain 200: T = +20 °C: 390.098556 V     T = -25 °C: 354.0596642 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.624456217 V-1     T = -25 °C: 5.108148006 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.165773964 V-1     T = -25 °C: 9.321507211 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.346664 V-1     T = -25 °C: 15.1717337 V-1
Break-through voltage: T = +20 °C: 405.6965872 V     T = -25 °C: 369.3718634 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:27 CET jreher Updated box and position via API.
07. Oct 2020 15:44:29 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:42 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:14 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:28 CET jreher Updated APD location via API.
25. Nov 2019 17:30:42 CET jreher Updated box and position via API.
25. Nov 2019 17:16:35 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:59 CEST Tobias Imported from Hamamatsu datasheet.