RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021291 - Archived data from Wed, 07. October 2020 15:44:29 CEST


This is all the information about APD 1913021291. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021291
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 401 V
Voltage for Gain 100 (T=+25°C): 372.3 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 265
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.4608692 V     T = -25 °C: 338.8165162 V
Voltage for Gain 150: T = +20 °C: 381.3128261 V     T = -25 °C: 346.0381126 V
Voltage for Gain 200: T = +20 °C: 385.6963358 V     T = -25 °C: 350.1112348 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.465243694 V-1     T = -25 °C: 5.28041597 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.613674975 V-1     T = -25 °C: 10.26685633 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89356833 V-1     T = -25 °C: 14.88432345 V-1
Break-through voltage: T = +20 °C: 400.1635322 V     T = -25 °C: 364.435549 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:27 CET jreher Updated box and position via API.
07. Oct 2020 15:44:29 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:42 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:14 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:28 CET jreher Updated APD location via API.
25. Nov 2019 17:30:42 CET jreher Updated box and position via API.
25. Nov 2019 17:16:34 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:59 CEST Tobias Imported from Hamamatsu datasheet.