RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021289 - Archived data from Tue, 08. December 2020 17:07:07 CET


This is all the information about APD 1913021289. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021289
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1913021289/2302024265
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.7 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 265
Position in Box: 15
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.2164332 V     T = -25 °C: 343.0328264 V
Voltage for Gain 150: T = +20 °C: 386.0771823 V     T = -25 °C: 350.3477519 V
Voltage for Gain 200: T = +20 °C: 390.4547873 V     T = -25 °C: 354.4577392 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.520007824 V-1     T = -25 °C: 4.953195495 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.908217759 V-1     T = -25 °C: 8.961213268 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.57433805 V-1     T = -25 °C: 17.21132873 V-1
Break-through voltage: T = +20 °C: 406.0681026 V     T = -25 °C: 369.8650849 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:26 CET jreher Updated box and position via API.
08. Dec 2020 17:07:07 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:02 CEST vwerner Updated box and position via API.
11. Aug 2020 17:49:41 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:14 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:28 CET jreher Updated APD location via API.
25. Nov 2019 17:30:41 CET jreher Updated box and position via API.
25. Nov 2019 17:16:34 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:59 CEST Tobias Imported from Hamamatsu datasheet.