RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021277 - Archived data from Wed, 07. October 2020 15:44:28 CEST


This is all the information about APD 1913021277. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021277
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.6 V
Dark current: 21.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 265
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.2961895 V     T = -25 °C: 349.6056991 V
Voltage for Gain 150: T = +20 °C: 393.0953206 V     T = -25 °C: 357.1101331 V
Voltage for Gain 200: T = +20 °C: 397.430387 V     T = -25 °C: 361.3409257 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.492049042 V-1     T = -25 °C: 4.948141833 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.840099777 V-1     T = -25 °C: 9.080639759 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.39320111 V-1     T = -25 °C: 15.88511787 V-1
Break-through voltage: T = +20 °C: 409.5030015 V     T = -25 °C: 376.8547819 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:25 CET jreher Updated box and position via API.
07. Oct 2020 15:44:28 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:39 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:13 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:27 CET jreher Updated APD location via API.
25. Nov 2019 17:30:41 CET jreher Updated box and position via API.
25. Nov 2019 17:17:54 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:58 CEST Tobias Imported from Hamamatsu datasheet.