RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1913021265 - Archived data from Fri, 05. February 2021 11:23:15 CET


This is all the information about APD 1913021265. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1913021265
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 400 V
Voltage for Gain 100 (T=+25°C): 372.4 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.7942065 V     T = -25 °C: 339.4915555 V
Voltage for Gain 150: T = +20 °C: 381.6132667 V     T = -25 °C: 346.8402735 V
Voltage for Gain 200: T = +20 °C: 385.9625423 V     T = -25 °C: 351.0081786 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.715001496 V-1     T = -25 °C: 4.849912667 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.391209711 V-1     T = -25 °C: 9.622942329 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.65511724 V-1     T = -25 °C: 15.53638438 V-1
Break-through voltage: T = +20 °C: 401.7286762 V     T = -25 °C: 364.2516895 V
   
Notes:


Version history

Time Author Change comment
05. May 2021 14:07:25 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:23:15 CET jreher Updated box and position via API.
11. Aug 2020 17:49:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:36:23 CEST jreher Updated box and position via API.
27. Nov 2019 20:16:17 CET jreher Updated APD location via API.
25. Nov 2019 17:30:53 CET jreher Updated box and position via API.
25. Nov 2019 17:14:07 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:58 CEST Tobias Imported from Hamamatsu datasheet.