RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021221 - Archived data from Wed, 07. October 2020 15:44:27 CEST


This is all the information about APD 1912021221. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021221
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 8.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 257
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8347452 V     T = -25 °C: 346.1117397 V
Voltage for Gain 150: T = +20 °C: 389.6370528 V     T = -25 °C: 353.502422 V
Voltage for Gain 200: T = +20 °C: 393.9515564 V     T = -25 °C: 357.6364385 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.694148004 V-1     T = -25 °C: 4.869662855 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.358609038 V-1     T = -25 °C: 8.98681475 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.74003746 V-1     T = -25 °C: 15.97097731 V-1
Break-through voltage: T = +20 °C: 409.2597145 V     T = -25 °C: 372.8285994 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:26 CET jreher Updated box and position via API.
07. Oct 2020 15:44:27 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:48 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:20 CET jreher Updated APD location via API.
25. Nov 2019 17:30:24 CET jreher Updated box and position via API.
25. Nov 2019 17:19:57 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:57 CEST Tobias Imported from Hamamatsu datasheet.