RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021212 - Archived data from Wed, 07. October 2020 15:44:27 CEST


This is all the information about APD 1912021212. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021212
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 9.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 257
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2667291 V     T = -25 °C: 345.9666478 V
Voltage for Gain 150: T = +20 °C: 389.1227296 V     T = -25 °C: 353.3778322 V
Voltage for Gain 200: T = +20 °C: 393.4912227 V     T = -25 °C: 357.536451 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.469950553 V-1     T = -25 °C: 4.871921657 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.749441933 V-1     T = -25 °C: 8.973907015 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15226385 V-1     T = -25 °C: 15.75145527 V-1
Break-through voltage: T = +20 °C: 408.9071562 V     T = -25 °C: 372.7189161 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:25 CET jreher Updated box and position via API.
07. Oct 2020 15:44:27 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:14 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:47 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:19 CET jreher Updated APD location via API.
25. Nov 2019 17:30:23 CET jreher Updated box and position via API.
25. Nov 2019 17:23:06 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 17:07:35 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:56 CEST Tobias Imported from Hamamatsu datasheet.