RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1912021195 - Archived data from Fri, 05. February 2021 11:18:57 CET


This is all the information about APD 1912021195. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1912021195
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 10.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 238
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4587989 V     T = -25 °C: 347.5659577 V
Voltage for Gain 150: T = +20 °C: 390.274917 V     T = -25 °C: 355.0535062 V
Voltage for Gain 200: T = +20 °C: 394.6164431 V     T = -25 °C: 359.3031434 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.45266723 V-1     T = -25 °C: 4.693899508 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.6990335 V-1     T = -25 °C: 9.065609376 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12072645 V-1     T = -25 °C: 16.55153256 V-1
Break-through voltage: T = +20 °C: 409.9672839 V     T = -25 °C: 373.6989635 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 15:22:32 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:18:57 CET jreher Updated box and position via API.
11. Aug 2020 17:47:21 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:39 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:11 CET jreher Updated APD location via API.
25. Nov 2019 17:29:21 CET jreher Updated box and position via API.
18. Nov 2019 18:20:34 CET spankonin Updated APD location via API.
18. Nov 2019 18:15:13 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:49:56 CEST Tobias Imported from Hamamatsu datasheet.